Ceramic coating studio, Kyiv
01 / Contact
An inspection comes first, before any package is quoted. You leave with measured readings, a defect map and a written substrate classification for each panel.
03 / Inspection request
Eight film-depth readings, a defect map under twin inspection lamps and a written substrate classification, handed over before any coating package is priced.
04 / Studio record
One Kyiv location handles paint inspection, substrate classification and coating handover. Below is the record you need before you arrive.
Warranty documents are issued at handover and tied to the coating package and its named technical data sheet. The service-life range, the maintenance interval that keeps it valid and the conditions attached are set out in the warranty exclusions table. Read them before the inspection, not after.